Project Showcase
S. 10th/11th Street I-5 Overpass:
| Agency: | Ridgefield |
|---|---|
| Status: | Design |
| Project Type: | New Construction Roadway |
| Description: | New collector arterial corridor and overpass over I-5. Project will provide two travel lanes, a multimodal mixed-use path, and ability for utilities to cross structure. |
| Termini: | S. Timm Road to Union Ridge Parkway |
| Project Length: | 0.70 miles |
| Federal Funds | Project Cost | Schedule | Obligation | |
|---|---|---|---|---|
| Preliminary Engineering | $391,000 | $2,500,000 | June 30, 2025 | |
| Right of Way | $500,000 | June 30, 2026 | ||
| Construction | $13,000,000 | June 30, 2027 | ||
| Total | $391,000 | $16,000,000 |
Project Photos
List of all projects.
